Sök:

Sökresultat:

10712 Uppsatser om Work load - Sida 1 av 715

Felisolering av hytt- och chassikomponenter på tunga fordon

This master of science thesis is focusing on how the fault handling on hardware connected toa control unit on a Scania vehicle is working. To the hardware counts buttons levers, sensorsand CAN. The work has been concentrated upon how the fault handling is working and if it ispossible to find any new fault modes.The control unit that has been studied is called the Coordinator and is the core in Scanias threenetworks of control units. The Coordinators work is to transmit messages between the threenetworks and to process signals from buttons, levers and sensors. The values is then usedinternally or is sent to other control units on the CAN networks.

Spänningsstyrd underfrekvenslastfrånkoppling i elektriska kraftsystem

This report is a Master?s Thesis performed by Andreas Adolfsson and David Jacobsson atChalmers University of Technology. The purpose of this master?s thesis is to evaluate anew method for load-shedding, the voltage controlled underfrequency load-sheddingdeveloped by ABB. This report presents a comparison between conventionalunderfrequency load-shedding and this new method for load-shedding.

Persontäthet vid utrymningsberäkningar : Köpcentrums persontätheter

The aim of this study is to evaluate whether the value of occupant load is over or under estimated when the Swedish general value for department stores, 0,5 person/m2, is used for dimensioning shopping centers. The data that was analyzed derives from seven shopping centers and one department store. A conservative method was used to calculate the occupant load factor. The analysis shows that two groups can be discerned: one group that is characterized by a lower occupant load factor that does not exceed 0,3 person/m2, and one group with a higher occupant load factor. Shopping centers with a higher occupant load factor are located centrally in large urban areas.

Mjölkproduktion : planering för om-, till- och nybyggnad

The objective of this thesis was to get more knowledge about how to design a dairy farm reducing the working hours and the work tasks whit high Work load. I will try to reduce the working hours and the tasks whit high Work load on my own farm witch I am about inherit. Today, the old stanchion barn has room for about 60 cows and 74 young cattle and need two men to run it every day. The total acre is 188 hectare, 100 hectare forest, 65 hectare farmlands and 23 hectare natural pasture. I have studied two solutions. In the first solution, I will use my old barn for young cattle and build a new barn for the cows.

Dynamisk modellering av kärnreaktor

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Kvalitetsarbete i samband med byggande av betongkonstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Momentfördelning i pelardäck av armerad betong

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Perkolationsfilter : En undersökning av reningseffekt med avseende på järn och mangan

This master thesis has been done in cooperation with Sweco Viak AB in Sundsvall. The aimwith the project is to investigate the purifying effect of percolation filter due to iron andmanganese. The overall goal was to investigate how the parameters surface load,sandfractions, and burden time affect the purifying effect. The expectation is to optimize thedesign and find a demouldning of the filter that gives sufficient purifying with a highersurface load. As an attempt to accelerate the curing of the filter, experiments with a layer ofsand which surface has been covered with manganese ore (MnO2) on top of the filter havebeen done.As test filters 10 L bars were used and the experimental work was performed at thewaterworks in Hassela and Munkbysjön.In Hassela different sandfractions were tested.

Diskret ickelinjär analys av geometriskt föränderliga linsystem

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

En bakgrund till skadorna på Slussens bärande konstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Energikartläggning i Sundbybergs stad

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Näringsbelastning på en anlagd våtmark från åker, skog och enskilda avlopp :

This work is a part of the project ?Våtmarker i odlingslandskapet ? uppföljning av miljömålen? (Wetlands in arable land ? following-up of the environmental goals). The main objective with this project is to study nitrogen and phosphorus retention in a constructed wetland by using mass balance calculations. Continuous measurements of nutrients and water flow through the inlet and the outlet of the wetland are made. However, substantial amounts of nitrogen and phosphorus were assumed to reach the wetland with a drain-pipe transporting wastewater from nearby houses (10 persons).

Övervakning och detektering av sprickor i betong med en elektriskt ledande färg

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Analys av beställarkrav vid upphandling av entreprenader

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Orsaker och sammanhang kring avvikelser i processen med prefabricerat byggande

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

1 Nästa sida ->